Our Business Process

Site Selection

The location of the bridge should be carefully chosen, taking into account factors such as the terrain, water flow, and soil conditions.

Design

The bridge design should be based on the intended use, traffic volume, and environmental factors. It should also comply with relevant codes and standards.

Materials

The materials used for bridge construction should be selected based on their strength, durability, and resistance to corrosion and other environmental factors.

Foundation

The foundation of the bridge should be designed to support the weight of the structure and withstand external forces such as wind and water.

Piers and Abutments

Piers and abutments should be designed to provide adequate support for the bridge deck and to resist lateral forces.

Merchandising & Coordination

Managing and coordinating every minute activity involved starting from processing the purchase order to analyse raw materials to negotiating price, troubleshooting any issues/problems being faced during the process, ensuring all activities are being done as per timeline to ensure they are on time and as per shipping commitments. Our expert team members take care of all this for your business needs.

Deck

The bridge deck should be designed to accommodate the intended traffic volume and to provide a smooth and safe driving surface.

Expansion Joints

Expansion joints should be installed to allow for the expansion and contraction of the bridge deck due to temperature changes.

Drainage

Proper drainage should be provided to prevent water from accumulating on the bridge deck and to protect the structure from water damage.


Send Us Message

Your query will be responded in 24 hours on working days.


+91 7017387215